New Reduced price! CSA N292.2-13 (R2018) View larger

CSA N292.2-13 (R2018)

M00052137

New product

CSA N292.2-13 (R2018) Interim Dry Storage of Irradiated Fuel

standard by CSA Group, 07/01/2013

Full Description

Preface

This is the third edition of CSA N292.2, Interim dry storage of irradiated fuel. It supersedes the previous edition published in 2007.

This Standard is part of a series of Standards on radioactive waste management. It provides life cycle requirements for the interim dry storage of irradiated fuel and covers site selection, design, quality assurance, commissioning, operation, safety, and planning for decommissioning.

This edition has been updated to reflect current industry practice, regulatory changes, and new technologies. Major changes to this edition include
a) updated reference publications;
b) consolidation and reorganization of the general requirements;
c) clarifications on life cycle phases and aging management;
d) increased emphasis on safety and security;
e) broader management systems; and
f) the removal of requirements related to off-site transportation to centralized storage.

Users of this Standard are reminded that the site selection, design, manufacture, construction, installation, commissioning, operation, and decommissioning of nuclear facilities in Canada are subject to the Nuclear Safety and Control Act and its Regulations. The Canadian Nuclear Safety Commission might impose additional requirements to those specified in this Standard.

The CSA N-Series Standards provide an interlinked set of requirements for the management of nuclear facilities and activities. The CSA N286 Standard provides overall direction to management to develop and implement sound management practices and controls, while the other CSA nuclear Standards provide technical requirements and guidance that support the management system. This Standard works in harmony with CSA N286 and does not duplicate the generic requirements of CSA N286; however, it may provide more specific direction for those requirements.

Scope

1.1
This Standard applies to interim dry storage systems for irradiated fuel including damaged or defective fuel.

Note:
For damaged or defective fuel, there may be additional processing and packaging requirements for interim dry storage that are not detailed in this Standard.

1.2
This Standard specifies requirements for the site selection, design, construction, commissioning, operation, and planning for decommissioning of dry storage systems. Dry storage systems include facilities, structures, support services, and equipment required for
a) transferring irradiated fuel
i) from wet storage to dry storage containers; and
ii) to a dry storage facility;
b) processing;
c) storage of irradiated fuel;
d) monitoring;
e) retrieval of irradiated fuel from dry storage; and
f) decommissioning planning.

1.3
This Standard specifies safety and security requirements for dry storage systems.

1.4
This Standard specifies requirements for management systems, including those for quality assurance, environmental management, aging management, and decommissioning planning.

1.5
This Standard does not specify requirements for off-site transportation to centralized storage and/or disposal including the handling, packaging, or transfer of irradiated fuel.

1.6
In CSA Standards, "shall" is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; "should" is used to express a recommendation or that which is advised but not required; "may" is used to express an option or that which is permissible within the limits of the standard; and "can" is used to express possibility or capability.

Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material.

Notes to tables and figures are considered part of the table or figure and may be written as requirements.

Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.

More details

In stock

$355.50

-55%

$790.00

More info

xflggryt

N292.2-13


Interim dry storage of irradiated fuel


REVISED JANUARY 2015

Legal Notice for Standards


Canadian Standards Association (operating as “CSA Group”) develops standards through a consensus standards development process approved by the Standards Council of Canada. This process brings together volunteers representing varied viewpoints and interests to achieve consensus and develop a standard. Although CSA Group administers the process and establishes rules to promote fairness in achieving consensus, it does not independently test, evaluate, or verify the content of standards.

Disclaimer and exclusion of liability

This document is provided without any representations, warranties, or conditions of any kind, express or implied, including, without limitation, implied warranties or conditions concerning this document’s fitness for a particular purpose or use, its merchantability, or its non-infringement of any third party’s intellectual property rights. CSA Group does not warrant the accuracy, completeness, or currency of any of the information published in this document. CSA Group makes no representations or warranties regarding this document’s compliance with any applicable statute, rule, or regulation.

IN NO EVENT SHALL CSA GROUP, ITS VOLUNTEERS, MEMBERS, SUBSIDIARIES, OR AFFILIATED COMPANIES, OR THEIR EMPLOYEES, DIRECTORS, OR OFFICERS, BE LIABLE FOR ANY DIRECT, INDIRECT, OR INCIDENTAL DAMAGES, INJURY, LOSS, COSTS, OR EXPENSES, HOWSOEVER CAUSED, INCLUDING BUT NOT LIMITED TO SPECIAL OR CONSEQUENTIAL DAMAGES, LOST REVENUE, BUSINESS INTERRUPTION, LOST OR DAMAGED DATA, OR ANY OTHER COMMERCIAL OR ECONOMIC LOSS, WHETHER BASED IN CONTRACT, TORT (INCLUDING NEGLIGENCE), OR ANY OTHER THEORY OF LIABILITY, ARISING OUT OF OR RESULTING FROM ACCESS TO OR POSSESSION OR USE OF THIS DOCUMENT, EVEN IF CSA GROUP HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES, INJURY, LOSS, COSTS, OR EXPENSES.

In publishing and making this document available, CSA Group is not undertaking to render professional or other services for or on behalf of any person or entity or to perform any duty owed by any person or entity to another person or entity. The information in this document is directed to those who have the appropriate degree of experience to use and apply its contents, and CSA Group accepts no responsibility whatsoever arising in any way from any and all use of or reliance on the information contained in this document.

CSA Group is a private not-for-profit company that publishes voluntary standards and related documents. CSA Group has no power, nor does it undertake, to enforce compliance with the contents of the standards or other documents it publishes.

Intellectual property rights and ownership

As between CSA Group and the users of this document (whether it be in printed or electronic form), CSA Group is the owner, or the authorized licensee, of all works contained herein that are protected by copyright, all trade-marks (except as otherwise noted to the contrary), and all inventions and trade secrets that may be contained in this document, whether or not such inventions and trade secrets are protected by patents and applications for patents. Without limitation, the unauthorized use, modification, copying, or disclosure of this document may violate laws that protect CSA Group’s and/or others’ intellectual property and may give rise to a right in CSA Group and/or others to seek legal redress for such use, modification, copying, or disclosure. To the extent permitted by licence or by law, CSA Group reserves all intellectual property rights in this document.

Patent rights

Attention is drawn to the possibility that some of the elements of this standard may be the subject of patent rights. CSA Group shall not be held responsible for identifying any or all such patent rights. Users of this standard are expressly advised that determination of the validity of any such patent rights is entirely their own responsibility.

Authorized use of this document

This document is being provided by CSA Group for informational and non-commercial use only. The user of this document is authorized to do only the following:

If this document is in electronic form:

  • load this document onto a computer for the sole purpose of reviewing it;

  • search and browse this document; and

  • print this document if it is in PDF format.

    Limited copies of this document in print or paper form may be distributed only to persons who are authorized by CSA Group to have such copies, and only if this Legal Notice appears on each such copy.

    In addition, users may not and may not permit others to

  • alter this document in any way or remove this Legal Notice from the attached standard;

  • sell this document without authorization from CSA Group; or

  • make an electronic copy of this document.

    If you do not agree with any of the terms and conditions contained in this Legal Notice, you may not load or use this document or make any copies of the contents hereof, and if you do make such copies, you are required to destroy them immediately. Use of this document constitutes your acceptance of the terms and conditions of this Legal Notice.



    N292.2-13, Interim dry storage of irradiated fuel


    Update No. 1 — January 2015

    Revision symbol (in margin)

    Clauses 2, 4, and 5.3.3.1 Annex A


    N292.2-13

    July 2013


    Title: Interim dry storage of irradiated fuel

    To register for e-mail notification about any updates to this publication

  • go to shop.csa.ca

  • click on CSA Update Service

The List ID that you will need to register for updates to this publication is 2422455.

If you require assistance, please e-mail techsupport@csagroup.org or call 416-747-2233.

Visit CSA Group’s policy on privacy at csagroup.org/legal to find out how we protect your personal information.


N292.2-13

Interim dry storage of irradiated fuel





Published in July 2013 by CSA Group

A not-for-profit private sector organization

178 Rexdale Boulevard, Toronto, Ontario, Canada M9W 1R3


To purchase standards and related publications, visit our Online Store at shop.csa.ca

or call toll-free 1-800-463-6727 or 416-747-4044.


ISBN 978-1-77139-202-0


© 2013 CSA Group

All rights reserved. No part of this publication may be reproduced in any form whatsoever without the prior permission of the publisher.

Contents

Technical Committee on Radioactive Waste Management 3 Subcommittee on Interim Dry Storage of Irradiated Fuel 5 Preface 6

  1. Scope 8


  2. Reference publications 9


  3. Definitions 11


  4. General requirements 13


  5. General requirements for the interim dry storage of irradiated fuel 13

    1. Licensing 13

    2. Environment, health, and safety 14

      1. General 14

      2. Nuclear safety 14

    3. Safety analysis 14

      1. Normal operating conditions 14

      2. Abnormal operating conditions 14

      3. Criticality 15

    4. Management 16

      1. Environmental management systems 16

      2. Aging management 16

      3. Documentation 16


  6. Specific requirements for the interim dry storage of irradiated fuel 17

    1. Site selection 17

    2. Site selection considerations 17

    3. Dry storage system design 18

      1. General 18

      2. Primary storage components 18

      3. Storage containers 19

      4. Fuel-handling facility 21

      5. Fuel conveyance systems (on-site transfer or transport) 22

      6. Container processing area 23

      7. Loaded container storage areas 24

    4. Commissioning 25

    5. Operations 25

      1. General 25

      2. Maintenance, testing, examination, and inspection 26

      3. Records of fuel inventory 26

      4. Modification control 26



July 2013 © 2013 CSA Group 1

Annex A (deleted) — 27


July 2013 © 2013 CSA Group 2

Preface

This is the third edition of CSA N292.2, Interim dry storage of irradiated fuel. It supersedes the previous editions published in 2007 and 1996.


This Standard is part of a series of Standards on radioactive waste management. It provides life-cycle requirements for the interim dry storage of irradiated fuel and covers site selection, design, quality assurance, commissioning, operation, safety, and planning for decommissioning.

This edition has been updated to reflect current industry practice, regulatory changes, and new technologies. Major changes to this edition include

  1. updated reference publications;

  2. consolidation and reorganization of the general requirements;

  3. clarifications on life-cycle phases and aging management;

  4. increased emphasis on safety and security;

  5. broader management systems; and

  6. the removal of requirements related to off-site transportation to centralized storage.

    Users of this Standard are reminded that the site selection, design, manufacture, construction, installation, commissioning, operation, and decommissioning of nuclear facilities in Canada are subject to the Nuclear Safety and Control Act and its Regulations. The Canadian Nuclear Safety Commission might impose additional requirements to those specified in this Standard.


    The CSA N-Series Standards provide an interlinked set of requirements for the management of nuclear facilities and activities. CSA N286 provides overall direction to management to develop and implement sound management practices and controls, while the other CSA Group nuclear Standards provide technical requirements and guidance that support the management system. This Standard works in harmony with CSA N286 and does not duplicate the generic requirements of CSA N286; however, it may provide more specific direction for those requirements.


    This Standard was prepared by the Subcommittee on Interim Dry Storage of Irradiated Fuel, under the jurisdiction of the Technical Committee on Radioactive Waste Management and the Strategic Steering Committee on Nuclear Standards, and has been formally approved by the Technical Committee.


    Notes:

    1. Use of the singular does not exclude the plural (and vice versa) when the sense allows.

    2. Although the intended primary application of this Standard is stated in its Scope, it is important to note that it remains the responsibility of the users of the Standard to judge its suitability for their particular purpose.

    3. This Standard was developed by consensus, which is defined by CSA Policy governing standardization — Code of good practice for standardization as “substantial agreement. Consensus implies much more than a simple majority, but not necessarily unanimity”. It is consistent with this definition that a member may be included in the Technical Committee list and yet not be in full agreement with all clauses of this Standard.

    4. To submit a request for interpretation of this Standard, please send the following information to

      inquiries@csagroup.org and include “Request for interpretation” in the subject line:

      1. define the problem, making reference to the specific clause, and, where appropriate, include an illustrative sketch;

      2. provide an explanation of circumstances surrounding the actual field condition; and

      3. where possible, phrase the request in such a way that a specific “yes” or “no” answer will address the issue.

        Committee interpretations are processed in accordance with the CSA Directives and guidelines governing standardization and are available on the Current Standards Activities page at standardsactivities.csa.ca.


        July 2013 © 2013 CSA Group 6

    5. This Standard is subject to periodic review, and suggestions for its improvement will be referred to the appropriate committee. To submit a proposal for change, please send the following information to inquiries@csagroup.org and include “Proposal for change” in the subject line:

      1. Standard designation (number);

      2. relevant clause, table, and/or figure number;

      3. wording of the proposed change; and

      4. rationale for the change.


July 2013 © 2013 CSA Group 7

N292.2-13

Interim dry storage of irradiated fuel


1 Scope


1.1

This Standard applies to interim dry storage systems for irradiated fuel including damaged or defective fuel.

Note: For damaged or defective fuel, there can be additional processing and packaging requirements for interim dry storage that are not detailed in this Standard.


1.2

This Standard specifies requirements for the site selection, design, construction, commissioning, operation, and planning for decommissioning of dry storage systems. Dry storage systems include facilities, structures, support services, and equipment required for

  1. transferring irradiated fuel

    1. from wet storage to dry storage containers; and

    2. to a dry storage facility;

  2. processing;

  3. storage of irradiated fuel;

  4. monitoring;

  5. retrieval of irradiated fuel from dry storage; and

  6. decommissioning planning.


1.3

This Standard specifies safety and security requirements for dry storage systems.


1.4

This Standard specifies requirements for management systems, including those for quality assurance, environmental management, aging management, and decommissioning planning.


1.5

This Standard does not specify requirements for off-site transportation to centralized storage and/or disposal including the handling, packaging, or transfer of irradiated fuel.


1.6

In this Standard, “shall” is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; “should” is used to express a recommendation or that which is advised but not required; “may” is used to express an option or that which is permissible within the limits of the standard; and “can” is used to express possibility or capability.

Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material.


Notes to tables and figures are considered part of the table or figure and may be written as requirements.


July 2013 © 2013 CSA Group 8